• Gortlum, Dublin, D24 E653

Bunker Progress 4th & 17th

4th Hole Left will be reduced in size, 4th Hole Right is now finished, with drainage renewed.
17th left has been slightly reduced, re-shaped and re-sanded.

4th Right Finished

4th Right B

above photo is 4th Hole Right (A)

above 2 photos are 17th hole Left

Share:

    Become a Member

    Follow us

    You can find us on Facebook, Instagram, Twitter, LinkedIn an You Tube.